No prob 
I wil also do a 6870 build with R785/RS805 brakes and DT Swiss R24 Spline db wheels.
Should be finished in about 3-4 weeks.

I wil also do a 6870 build with R785/RS805 brakes and DT Swiss R24 Spline db wheels.
Should be finished in about 3-4 weeks.
